— The Lelon Method

SIX PHASES.ZERO SHORTCUTS.

Every project moves through the same disciplined sequence. The phases are not optional. Their order is not negotiable. This is how a 120-project track record is built — one rigorous step at a time.

Phase 01 · 1–2 weeks

DISCOVERY

Site visit, brief capture, feasibility report. We map the constraints before drawing a single line — soil, regulation, budget, neighbours, sunlight, drainage.

01
Deliverables
  • Feasibility memo
  • Site survey
  • Preliminary cost band
Deliverables
  • Concept presentation
  • Schematic drawings
  • Material palette
02
Phase 02 · 3–6 weeks

DESIGN

Concept, schematic, and detailed design — produced with you, not for you. Three iterations are standard. We commit nothing to engineering until the design feels inevitable.

Phase 03 · 2–4 weeks

ENGINEERING

Structural, MEP, and civil engineering documents. Every load path is calculated twice. Every penetration is coordinated. The drawing set is a contract with reality.

03
Deliverables
  • Structural calculations
  • MEP coordination set
  • Construction documents
Deliverables
  • Weekly progress reports
  • Quality inspections
  • Safety logs
04
Phase 04 · Project-specific

CONSTRUCTION

Site mobilisation, foundation, structure, envelope. Weekly progress reports with photographic record. A senior engineer is on site every working day — non-negotiable.

Phase 05 · 4–10 weeks

FINISHING

Interiors, joinery, fixtures, commissioning. The phase where buildings stop being structures and become places. Punch-list discipline is absolute.

05
Deliverables
  • Snag list closure
  • Systems commissioning
  • Final inspections
Deliverables
  • Operating manuals
  • 12-month warranty
  • Annual check-ins
06
Phase 06 · Ongoing

HANDOVER

Documentation, training, warranty. We hand over operating manuals and a relationship. Our team is reachable for the life of the building — not just the warranty.